This is topic ST1200 assurance before I go in! in forum 8mm Forum at 8mm Forum.


To visit this topic, use this URL:
https://8mmforum.film-tech.com/cgi-bin/ubb/ultimatebb.cgi?ubb=get_topic;f=1;t=003138

Posted by Barry Johnson (Member # 84) on October 14, 2007, 10:40 AM:
 
Fitted new drive rubbers and the two small drive belts but,now must change the long belt accross the top of the machine.It looks straight forward by removing the gearsand then easing the belt round space available.
Knowing my luck there is probably a wrong way to do this so that is why I need some guidance.
Anything I should watch out for then??
 
Posted by Tom Photiou (Member # 130) on October 14, 2007, 11:25 AM:
 
Not really Barry,as you say once the gear is out the way its just lift it over and out, once its out though make sure you give the groove of both pullys a ood clean out.
 


Visit www.film-tech.com for free equipment manual downloads. Copyright 2003-2019 Film-Tech Cinema Systems LLC

Powered by Infopop Corporation
UBB.classicTM 6.3.1.2